The soil retention system we use is called ‘Solder Pile and Timber Lagging’. We use H beams for the piles and timber for the lagging. We typically provide soldier pile / timber lagging for excavations not exceeding 10 to 12 feet deep in depth.
With years of residential construction experience, our engineers and staff work efficiently to deliver long-lasting and cost-effective Soil Retention Systems.
Call (416-936-9865) today to talk about your ‘Solder Pile and Timber Lagging’ project.
Earth Retention Systems:
Solder Pile and Timber Lagging - Ideal in situations where excavation is close to existing structures, property lines or other elements.
ABOUT SOLDIER PILE TIMBER LAGGING
Soldier Piles (I-beams) and timber lagging in many cases will be the most economical choice for support of excavation.
Soldier pile and timber lagging walls are some of the oldest forms of retaining systems used in deep excavations. Soldier pile walls have successfully being used since the late 18th century in metropolitan cities like New York, Berlin, and London. The method is also commonly referred as the "Berlin Wall" when steel piles and Soldier Pile walls are formed by:
1. Constructing soldier piles at regular intervals (6 ft to 12 ft, typical). 2. Excavating in small stages and installing lagging.
3. Backfilling and compacting the void space behind the lagging.
An anchored soldier beam with lagging wall is a structure designed to provide lateral support for a soil mass and derives stability from passive resistance of the soil in which the soldier beam is embedded and from the tensile resistance of the ground anchors.
A. Anchored soldier beam with lagging walls are generally designed as flexible structures which have sufficient lateral movement to mobilize active earth pressures and a portion of the passive pressure.
B. Generally, soldier beams include steel H-piles, wide flange sections or other fabricated sections that are driven or set in drilled holes. Lagging refers to the members spanning between soldier beams.
The soldier piles can either be placed in drilled holes or installed by driving the beams into the ground. The soil must have sufficient cohesion and stability to retain a vertical face until the lagging can be installed between the soldier piles.
Soldier Pile and Timber Lagging is an earth retention system consisting of steel H piles driven or placed in drilled holes. After the soldier beams have been installed, the earth is excavated along one side of the beams to expose a cut face of earth, and to partially expose the front faces of the beams. Then lagging is installed with timber.
Moment resistance in soldier pile and lagging walls is provided solely by the soldier piles. Passive soil resistance is obtained by embedding the soldier piles beneath the excavation grade. The lagging bridges and retains soil across piles and transfers the lateral load to the soldier pile system.
Benefits of Soldier Pile walls:
Fast to Construct!
Installation is Versatile!
Cheaper than Other Systems!
Soldier pile and lagging walls are the most inexpensive systems compared to other retaining walls. They are also very easy and fast to construct. The major advantages of soldier pile walls are:
1. Soldier piles are fast to construct.
2. Soldier pile construction is cheaper when compared to other systems. 3. Soldier pile installation is versatile and adjustments can be made in the field easily to accommodate changes.
4. Lagging construction can be very quick.
5. Construction of soldier pile and lagging walls does not require very advanced construction techniques.
CIVIL ENGINEERING SOLUTIONS
As trained contractors and teamed with certified engineers, ATE Contracting is able to effectively solve even the most complicated commercial, residential, institutional and civil engineering problems.
ATE Contracting takes great pride in integrating professional engineering practices throughout the company, providing years of experience to ensure safe solutions to even the most complex structural problems, such as Underground Concrete Parking Garage Structural Restoration and Repairs. As well as bringing knowledge, skills and ability to the job site each day so that your ATE Contracting solution will last for years. We invite you to see a few of our many Case Studies.
FOUNDATION REPAIR AND STRUCTURAL REPAIR SOLUTIONS ATE Contracting views foundation problems, regardless of their level of difficulty, as an opportunity to provide long-lasting, cost-effective solutions. As both foundation repair contractors and engineers, ATE Contracting Repair Company consistently provides the right solution to virtually any foundation problem.
Knowledgeable, dependable and experienced in a full range of commercial, residential, institutional and civil projects, ATE Contracting takes pride in a proven track record of high quality completions.
You can trust ATE Contracting Repair Company to provide the right solution for your:
✓ Foundation Structural and Retaining Wall Repairs
✓ Home Improvements and Basement Renovations ems
✓ Home Improvements and Basement Renovations
✓ Basement Foundation Waterproofing
✓ Residential Shoring - Timber Lagging ances
✓ Residential Shoring - Timber Lagging
✓ Underground Concrete Parking Garage Restoration and Repairs